Day 12 - 13 of Renovation @ Northshore Residences

We finally fixed the appointment for City Gas to drop by our home to install the pipes for our cooker. So happy to see the pipings are all done :)


Not only that, our storage heater for our two bathrooms are also installed over the weekends too. Chose to go for the storage heater instead because we are using rainshower and bathtub so I would want to have a decent water pressure since the water are ready 24/7 and we just got to wait for the water to be at the right temperature next time :)

So excited to see that the bathtub are installed in our master bathroom and the tiler is fixing up the tiles over it. It would look so beautiful once the gaps between the tiles are filled and the bathrooms are cleaned.