Thursday, 5 November 2020

Day 7-8 of Renovation @ Northshore Residences

The renovation to our home is progressing pretty fast as the contractors are coming over to do the tiling for the two bathrooms on day 7 since we started the renovation. We are overlaying tiles on our existing bathroom walls and floor using our preferred tiles that we have chose previously. Can't wait to see how it all turns out for our bathroom with the bathtub and all :)



So happy to see the contractors started working on the installation of the false ceiling for our living room area and also the various rooms to hide the aircon trunking that really look out of place. Now we just got to wait until the time where the lights are installed and we would be able to see the fruits of our renovation :) 








Tuesday, 3 November 2020

Day 5-6 of Renovation @ Northshore Residences

We are coming to the second week of the renovation done on our home and the electricians are coming to run the electrical points for the living room and all the bedrooms around the house. I can't wait for the lights to be up few weeks down the road :)







That's all for the renovation done for the past 2 days. Can't wait for them to start work on the bathroom.

Saturday, 31 October 2020

Day 3 of Renovation @ Northshore Residences

Well, there's no renovation done for our home today but we have Mr Ho from FC Family Curtain Enterprise coming over to take the measurements for the curtains and blinds that we are going to do for all our rooms. 

Easy peasy process as Mr Ho was in the business for more than 10 years so the entire measurement taking and selection of materials and colors was really quick :) Can't wait for the curtains and blinds to be up. 


Look at how fast our green beans have sprouted this week lalala. Took a picture of it against the tiles that we have chosen for our bathrooms.

Friday, 30 October 2020

Day 2 of Renovation @ Northshore Residences

It's day 2 of the renovation for our future home and we have the technicians from GainCity coming over to fix up the air-con trunking for the whole house. Due to the location of our bedroom 2, it is not a straight forward job to run the aircon trunking from bedroom 2 to bedroom 1 and finally to our masterbed room before it reaches the bathroom. Imagine the entire households from Northshore Residences project have to face this issue for our aircons. 





Behold the before and after photos of our home after the technicians run the aircon trunking for our home.


 

Trunking starts from Bedroom 2

Trunking from Bedroom 2 to the Living room

Trunking at Dining Area / Living Room

Trunking from the living room to Bedroom 1

Trunking in Bedroom 1

Trunking near to entrance of Bedroom 1

Trunking from Bedroom 1 to Masterbed room

Trunking from Masterbed room to the bathroom
 
Last stop for the aircon trunking

Yeah, the lights that we have ordered from Chan Huat Lighting has arrived today. Now what's left are the fans that will be coming in the next two weeks :)


Thursday, 29 October 2020

Day 1 of Renovation @ Northshore Residences

Finally we are going to kickstart the renovation to our new home after consulting Master David Tong for the auspicious dates to start our renovation. Heng ah because Master David Tong give us the green light to go ahead with the renovation today because we would have to wait for another week. One week matters alot now given the current Covid-19 situation where there are lack of workers and materials everywhere. 


According to Master David Tong, we can start the hacking or drilling within the 2 hours auspicious timing provided by him so here I am with a hammer to kick start the renovation hahaha. 

Really glad to see the contractors laying the cardboards on the floor and doors to protect the tiles and doors before starting the renovation because that is a must if you want to avoid any unnecessary scratches or damage to the existing floor tiles and doors. 

Time to hack down the bi-fold doors and shutter windows from our service yard area because we dislike them that much lol. 




Time to remove the "eco-friendly" toilet bowls with taps above and basin from our common bathroom and masterbedroom because we are getting our own plus we are going to overlay the entire bathroom. Can't wait to see the final result.




And that is all for day 1 of the renovation to our new home :)

Tuesday, 27 October 2020

3rd Day of Open Door Ceremony @ Northshore Residences

Today's the third day after our "Open Door Ceremony" so it's time for us to remove the fruits from our home and also to place the pineapple below a tree to allow the prosperity to continue to grow. So happy to see the green beans have sprouted.